Skip to main content
mERP SOP LibraryAll Procedures
Robin Fictional Example
Account Administrator · Example Foods Collective · Sample Bakery Company · Bakery Plant 1

Current Procedure

Clear instructions, with the revision and location visible.

Production Shift Handoff Current Example

At a glance
Code
PRD-101
Revision
Rev02
Effective date
2026-02-01
Owner
Sage Placeholder (Manager)
About this procedure
Purpose
Pass production information from one shift to the next so nothing is lost.
Scope
Applies to production supervisors at the example bakery plant at every shift change.
Responsibilities
The outgoing supervisor prepares the handoff; the incoming supervisor reviews it and asks questions.
Steps
  1. Meet the incoming supervisor at the production line.
  2. Review the shift notes: what ran, what is in progress and what is waiting.
  3. Walk the line together and point out open work orders.
  4. Share any equipment issues that were reported during the shift.
  5. Confirm which products are on hold and where they are stored.
  6. Record the handoff on the shift sheet and have both supervisors confirm it.
  7. Tell the team the handoff is complete.
Exceptions
If the incoming supervisor is not available, the outgoing supervisor stays until the plant manager names a covering lead.
Scope and ownership
Type
SOP
Department
Production
Applies to
Bakery Plant 1
State
Current
Related training

Courses for this procedure would be linked here.

Not connected Not connected in this preview.
Related forms

Forms and records for this procedure would be linked here.

Not connected Not connected in this preview.
Edit in the editor (author preview) Opens the editor example. Nothing is saved.
Preview controls

Display only. This does not sign anyone in or change access.

Example business

Example person